During the winter of 2006 and the spring of 2007 local workmen had used a backhoe to dig out the stairway and a space for the shower room for the lower level.

Before we arrived in June they had also set the cement block walls and poured the concrete stairs.

Since the floor of the West Wing was going to be a concrete slab, the ceiling of the shower room is also a concrete slab.