Lower East Shower and
South
Guest Room
image10.jpg
Previous Next
The room is beginning to take on its final appearance. The pocket door is set in the stud wall enclosing the toilet, Heidi has finished pointing the stone walls, and the electrical cabling to supply the house will be buried in the wall to the right of the window.

We have yet to lay the stone floor, brush down the walls, paint the sheetrock wall and install the electrical outlets and the heater for this room.