| The Upper East Side | ![]() | ||||||
| Previous | Next | ||||||
| With the door installed we had a useable toilet on the middle floor of the barn. Notice how the sheetrock wall is fitted around the joists of the ceiling. The sinks are in place and we can now connect the water and drains to them To the right of the cupboard wall is black slate tile to step out onto at the end of the shower. | |||||||