| During the spring of 2007 Heidi and Clark and their friend, Jim were able to build scaffolding to set the other beams from the outer wall to the center of the barn. The lower right corner of the picture shows the new stone work on the top of the wall of the Lower East side. And on this side of that stone work is the poured-in-place concrete beam that stabilizes that wall and ties the beams to the outside wall to support its integrity. | |||||||