| The West Wing | ![]() | |||||
| Previous | Next | |||||
| We are ready for the ready-mix delivery. Over a bed of several inches of crushed rock is the 4 cm insulation and the re-bar grid. Along the edges are the canisters with the electrical conduit in them. The ramp at the door will allow us to run the concrete in wheel barrows from the street into the West Wing. | ||||||