Lower East
North
Guest Room
image8.jpg
Previous Next
In March of 2007 Clark and Heidi had set the huge 12 x 12 cross beams from the center wall to the outside wall of the Lower East Side and in late May Carl and Norma had set the cross beams into them.

Later in the session we nailed the subfloor of the Upper East bedroom to those beams.

The sheetrock stored here will eventually be pulled out to build the walls in the rest of the house. Angling across the right corner of this picture is the edge of the wall dividing the two guestrooms.