The Upper East Side
image10.jpg
Previous Next
By the middle of the 2007 work session the floor was down except for the far third.

We had built the stud and sheetrock wall down the middle of this floor of the barn. We had replaced the long vertical beams to the floor of the loft with beams set on the concrete beam in the top of the lower stone wall.

Barely visible beyond the cut-out for the electrical box is the concrete column Heidi and Clark had poured to preserve the stone doorway from the West Wing to this room.